(1) In order to load and stow the goods on board, the carrier is to berth the ship at the loading wharf designated in the voyage charter contract or at the loading wharf to be designated by the shipper following conclusion of the voyage charter contract.
(2) If no port of loading or loading wharf has been designated in the voyage charter contract and the shipper is to designate the port of loading or loading wharf following conclusion of the voyage charter contract, then the shipper must exercise due care in choosing a secure port of loading or loading wharf.