(1) If a plot of land lacks the connection to a public road necessary for the due use, the owner may require of the neighbours that until the defect is removed they tolerate the use of their plots of land to create the required connection. The direction of the right of way of necessity and the scope of the right of use are, if required, determined by judicial decision.
(2) The neighbours over whose plots of land the right of way of necessity leads are to be compensated by periodical payments. The provisions of section 912 (2) sentence 2 and sections 913, 914 and 916 apply accordingly.