CACM Guideline Regulation In force since 24 July 2015
Articles
- Article 1 — Subject matter and scope
- Article 2 — Definitions
- Article 3 — Objectives of capacity allocation and congestion management cooperation
- Article 4 — NEMOs designation and revocation of the designation
- Article 5 — NEMOs designation in case of a national legal monopoly for trading services
- Article 6 — NEMO designation criteria
- Article 7 — NEMO tasks
- Article 8 — TSOs' tasks related to single day-ahead and intraday coupling
- Article 9 — Adoption of terms and conditions or methodologies
- Article 10 — Day-to-day management of the single day-ahead and intraday coupling
- Article 11 — Stakeholder involvement
- Article 12 — Consultation
- Article 13 — Confidentiality obligations
Chapter 1 Capacity calculation
Section 1 General requirements
Section 2 The common grid model
- Article 16 — Generation and load data provision methodology
- Article 17 — Common grid model methodology
- Article 18 — Scenarios
- Article 19 — Individual grid model
Section 3 Capacity calculation methodologies
- Article 20 — Introduction of flow-based capacity calculation methodology
- Article 21 — Capacity calculation methodology
- Article 22 — Reliability margin methodology
- Article 23 — Methodologies for operational security limits, contingencies and allocation constraints
- Article 24 — Generation shift keys methodology
- Article 25 — Methodology for remedial actions in capacity calculation
- Article 26 — Cross-zonal capacity validation methodology
Section 4 The capacity calculation process
- Article 27 — General provisions
- Article 28 — Creation of a common grid model
- Article 29 — Regional calculation of cross-zonal capacity
- Article 30 — Validation and delivery of cross-zonal capacity
Section 5 Biennial report on capacity calculation and allocation
Chapter 2 Bidding zone configuration
- Article 32 — Reviewing existing bidding zone configurations
- Article 33 — Criteria for reviewing bidding zone configurations
- Article 34 — Regular reporting on current bidding zone configuration by ENTSO for Electricity and the Agency
Chapter 3 Redispatching and countertrading
Chapter 4 Algorithm development
Chapter 5 Single day-ahead coupling
Section 1 The price coupling algorithm
- Article 38 — Objectives of the price coupling algorithm
- Article 39 — Inputs and results of the price coupling algorithm
- Article 40 — Products accommodated
- Article 41 — Maximum and minimum prices
- Article 42 — Pricing of day-ahead cross-zonal capacity
- Article 43 — Methodology for calculating scheduled exchanges resulting from single day-ahead coupling
- Article 44 — Establishment of fallback procedures
- Article 45 — Arrangements concerning more than one NEMO in one bidding zone and for interconnectors which are not operated by certified TSOs
Section 2 The single day-ahead coupling process
- Article 46 — Provision of input data
- Article 47 — Operation of single day-ahead coupling
- Article 48 — Delivery of results
- Article 49 — Calculation of scheduled exchanges resulting from single day-ahead coupling
- Article 50 — Initiation of fallback procedures
Chapter 6 Single intraday coupling
Section 1 Objectives, conditions and results of single intraday coupling
- Article 51 — Objectives of the continuous trading matching algorithm
- Article 52 — Results of the continuous trading matching algorithm
- Article 53 — Products accommodated
- Article 54 — Maximum and minimum prices
- Article 55 — Pricing of intraday capacity
- Article 56 — Methodology for calculating scheduled exchanges resulting from single intraday coupling
- Article 57 — Arrangements concerning more than one NEMO in one bidding zone and for interconnectors which are not operated by certified TSOs
Section 2 The single intraday coupling process
- Article 58 — Provision of input data
- Article 59 — Operation of single intraday coupling
- Article 60 — Delivery of results
- Article 61 — Calculation of scheduled exchanges resulting from single intraday coupling
- Article 62 — Publication of market information
- Article 63 — Complementary regional auctions
Section 3 Transitional intraday arrangements
- Article 64 — Provisions relating to explicit allocation
- Article 65 — Removal of explicit allocation
- Article 66 — Provisions relating to intraday arrangements
- Article 67 — Explicit requests for capacity
Chapter 7 Clearing and settlement for single day-ahead and intraday coupling
Chapter 8 Firmness of allocated cross-zonal capacity
- Article 69 — Proposal for day-ahead firmness deadline
- Article 70 — Firmness of day-ahead capacity and allocation constraints
- Article 71 — Firmness of intraday capacity
- Article 72 — Firmness in the event of force majeure or emergency situations
Chapter 1 Congestion income distribution methodology for single day-ahead and intraday coupling
Chapter 2 Redispatching and countertrading cost sharing methodology for single day-ahead and intraday coupling
Chapter 3 Capacity allocation and congestion management cost recovery
- Article 75 — General provisions on cost recovery
- Article 76 — Costs of establishing, amending and operating single day-ahead and intraday coupling
- Article 77 — Clearing and settlement costs
- Article 78 — Costs of establishing and operating the coordinated capacity calculation process
- Article 79 — Costs of ensuring firmness
- Article 80 — Cost sharing between NEMOs and TSOs in different Member States
- Article 81 — Delegation of tasks
- Article 82 — Monitoring of the implementation of single day-ahead and intraday coupling
- Article 83 — Transitional provisions for Ireland and Northern Ireland
- Article 84 — Entry into force