[eu]cite

Home› Competition & Trade› General Block Exemption Regulation (GBER)

Chapter III · SPECIFIC PROVISIONS FOR DIFFERENT CATEGORIES OF AID  ›  Section 7 · Aid for environmental protection › Article 42

Operating aid for the promotion of electricity from renewable sources

1.   Operating aid for the promotion of electricity from renewable energy sources shall be compatible with the internal market within the meaning of Article 107(3) of the Treaty and shall be exempted from the notification requirement of Article 108(3) of the Treaty, provided that the conditions laid down in this Article and in Chapter I are fulfilled.

2.   Aid shall be granted in a competitive bidding process on the basis of clear, transparent and non-discriminatory criteria which shall be open to all generators producing electricity from renewable energy sources on a non-discriminatory basis.

3.   The bidding process can be limited to specific technologies where a process open to all generators would lead to a suboptimal result which cannot be addressed in the process design in view of in particular:

(i)

the longer-term potential of a given new and innovative technology; or

(ii)

the need to achieve diversification; or

(iii)

network constraints and grid stability; or

(iv)

system (integration) costs; or

(v)

the need to avoid distortions on the raw material markets from biomass support

Member States shall carry out a detailed assessment of the applicability of such conditions and report it to the Commission according to the modalities described in Article 11 (a).

4.   Aid shall be granted to new and innovative renewable energy technologies in a competitive bidding process open to at least one such technology on the basis of clear, transparent and non-discriminatory criteria. Such aid shall not be granted for more than 5 % of the planned new electricity capacity from renewable energy sources per year in total.

5.   Aid shall be granted as a premium in addition to the market price whereby the generators sell their electricity directly in the market.

6.   Aid beneficiaries shall be subject to standard balancing responsibilities. Beneficiaries may outsource balancing responsibilities to other undertakings on their behalf, such as aggregators.

7.   Aid shall not be granted when prices are negative.

8.   Aid may be granted in the absence of a competitive bidding process as described in paragraph 2 to installations with an installed electricity capacity of less than 1 MW for the production of electricity from all renewable sources except for wind energy, where aid may be granted in the absence of a competitive bidding process as described in paragraph 2 to installations with an installed electricity capacity of less than 6 MW or to installations with less than 6 generation units. Without prejudice to paragraph 9, when aid is granted in the absence of a competitive bidding process, the conditions under paragraphs 5, 6 and 7 shall be respected. In addition, when aid is granted in the absence of a competitive bidding process, the conditions under Article 43 paragraphs 5, 6 and 7 shall be applicable.

9.   The conditions under paragraphs 5, 6 and 7 shall not apply to operating aid granted to installations with an installed electricity capacity of less than 500 kW for the production of electricity from all renewable sources except for wind energy, where these conditions shall not apply to operating aid granted to installations with an installed electricity capacity of less than 3 MW or to installations with less than 3 generation units.

10.   For the purpose of calculating the above maximum capacities referred to in paragraphs 8 and 9, installations with a common connection point to the electricity grid shall be considered as one installation.

11.   Aid shall only be granted until the plant generating the electricity from renewable sources has been fully depreciated according to generally accepted accounting principles. Any investment aid previously received must be deducted from the operating aid.

←→ also move between articles