[eu]cite

Home› Other› Industrial Emissions Directive

Chapter IV · SPECIAL PROVISIONS FOR WASTE INCINERATION PLANTS AND WASTE CO-INCINERATION PLANTS › Article 44

Applications for permits

An application for a permit for a waste incineration plant or waste co-incineration plant shall include a description of the measures which are envisaged to guarantee that the following requirements are met:

(a)

the plant is designed, equipped and will be maintained and operated in such a manner that the requirements of this Chapter are met taking into account the categories of waste to be incinerated or co-incinerated;

(b)

the heat generated during the incineration and co-incineration process is recovered as far as practicable through the generation of heat, steam or power;

(c)

the residues will be minimised in their amount and harmfulness and recycled where appropriate;

(d)

the disposal of the residues which cannot be prevented, reduced or recycled will be carried out in conformity with national and Union law.

←→ also move between articles